Electrical advice for Crewe landlords

Landlord electrical safety rules: a plain guide for Crewe landlords

If you let a house or flat in Crewe, the law in England sets out what you must do about its electrics and when. The rules are not complicated, but the deadlines are short and the penalty for missing them is large.

This guide is a summary of the government's own guidance, which is published on GOV.UK. It is not legal advice. Read the official guidance as well, and take advice if your case is unusual.

The rule in one sentence

Landlords must have the electrics in their rented properties inspected and tested at least every 5 years by a properly qualified person, and must give their tenants proof that it has been done.

The rule comes from the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020. As the name says, it applies in England. Other parts of the UK have their own arrangements.

The proof is a report, normally an Electrical Installation Condition Report, or EICR. Our EICR page explains what the inspection covers.

Who must get a copy, and by when

Having the report is half the duty. Handing it over is the other half. The guidance gives these time limits.

  • Your existing tenant: within 28 days of the inspection and test
  • A new tenant: before they occupy the property
  • Someone thinking of renting it: within 28 days of their asking
  • The council: within 7 days of its asking

For property in Crewe the council is Cheshire East. Keep a copy yourself as well, to pass to the electrician who carries out the next inspection.

When the report finds problems

Each fault on the report carries a code. The guidance describes C1 as danger present with a risk of injury, C2 as potentially dangerous, C3 as improvement recommended, and FI as further investigation required without delay.

A C3 does not oblige you to do anything, though acting on it makes the property safer. Where the report requires repairs or further investigation, the work must be completed within 28 days, or within a shorter time if the report says so.

Afterwards you need written confirmation from the electrician that the work has been done. That confirmation, with the original report, goes to the tenant and to the council within 28 days of the work being finished.

Changes of tenant, new builds and rewires

A new tenant does not always mean a new report. The guidance says a fresh inspection is not required at a change of tenancy if the last report is under five years old and did not call for further work. You must give the incoming tenant a copy. A visual check between tenancies is recommended.

A newly built or fully rewired property will have an Electrical Installation Certificate. The guidance says a landlord can give the tenant a copy of that certificate, and no further inspection is then required for 5 years from its date.

The report names the next date. The guidance says the report gives the results and sets a date for the next inspection and test. Put that date in your diary, and note that five years is the longest gap the rules allow.

Social housing is now included

The regulations were extended in 2025 to cover the social rented sector. According to the guidance, they came into force for social landlords on 1 November 2025 and apply to social tenancies granted after 1 December 2025.

For tenancies granted before that date, the guidance says the rules take effect on 1 May 2026, with the first inspections due before 1 November 2026. Social landlords who provide electrical equipment must have that tested as well.

What happens if a landlord does not comply

Councils enforce the rules. The guidance says a council may impose a financial penalty of up to £40,000 on a landlord in breach. Where a landlord ignores a notice to put things right, the council may arrange the work itself and recover the cost from the landlord.

Those are the official consequences. The practical ones matter too. A landlord with no valid report is in a weak position if there is a fire, an injury or a dispute with a tenant.

What the inspection typically costs

Checkatrade's guide says typical landlord costs run from around £100 for a flat to £250 or more for a house.

JobUK guide price
Electrical safety check (EICR)Source: Checkatrade electrical safety check cost guide£100 to £250typical about £200
Mains-wired smoke alarm, supplied and fittedSource: Checkatrade fire alarm installation cost guide£150 to £250typical about £200

Typical UK guide prices from the Checkatrade guides named, shown before VAT. Take them as guides, never as quotes. Repairs found by the inspection are priced separately.

Practical tips for Crewe landlords

  • Put the date the next inspection is due in your diary the day you receive the report, with a reminder two months ahead
  • Book while the property is empty between tenants if you can, since the power has to go off for the tests
  • Tell the electrician the age of the house, because an older terrace takes longer to test than a modern flat
  • Budget for some repairs after a first inspection on an older property
  • Keep every report and certificate together, on paper and as a scan

Crewe has a great many older terraces that are let, and these are the houses where a first report most often turns up work. Common findings are an outdated board, which means a new fuse box, and single faults that need tracing.

Common questions

How long is a landlord EICR valid?

The government's guidance for England says the electrics must be inspected and tested at least every 5 years. The report itself sets the date for the next inspection, so go by the date written on it.

Who can carry out a landlord's electrical inspection?

The guidance says it must be a qualified person, meaning someone competent to undertake the inspection and testing. In practice, choose an electrician registered with a government-approved scheme whose registration covers inspection and reports. Our guide to finding a good electrician shows how to check.

Does a landlord have to fix every item on the report?

No. Items coded C3 are recommendations. Where the report requires remedial work or further investigation, that must be done within 28 days or sooner if the report says so, and confirmed in writing.

Is your report due, or overdue?

The five years run from the date on the last report, and they pass quickly. If repairs are needed you have only 28 days to complete them, so leaving the inspection to the last week gives you no room. Booking early keeps you inside the law and your tenants safe.

Say that the property is let, where in Crewe it is and when it was last tested. No charge to find out.

Ask a Crewe electrician for a quote

Four short boxes. A minute at most.

By sending this form you agree to your details being shared with a local electrician so they can contact you. See our privacy notice.

Get a free quote